Weybridge Data Centre Power/UPS Room


Project Info

PROJECT

To design, manufacture, install and commission fully packaged, direct outside air free cooling solution for a large Data Centre Power / UPS Room.

SOLUTION

  • Install 2 off, externally located, 50kW free cool units - maximising utilisation of space within the power room
  • High grade filter system incorporated as standard  
  • Latest E.C. fan technology - delivering massive energy saving
  • Low CO2 emission solution
  • Free cooling available for majority of year - extending life time of cooling equipment
  • Trend IQ3 control system - with full remote monitoring and interrogation
  • Packaged, modular solution - N + 1 resilience achieved at lower capital cost